RELATED PROJECTS

  • • Majnoon Oil Field Project – 2022

    • Majnoon Oil Field Project – 2022 It contains the following activities: 1- Installation of the power plant:  Installing and connecting two electric generators, 2750 KVA -11 KV. Connect the synchronization system to the generators  Installing, connecting and checking MV Switchgears with all its accessories including installing Switchgears, connecting POWER CABLE and all…

  • Refinery of Baiji Project: (Ministry of Oil) – 2021

    Refinery of Baiji Project: (Ministry of Oil) – 2021 EPC for synchronization and SCADA System for uninterruptable power generation project 25MW • Our Scope contains the following activities: – Engineering and design The SCADA system of the project as per the standards and client specification. – Procurement and installation for all SCADA system and synchronization…

  • Fuel Station of (Balad Air force Base) Project: (Sallyport) – 2021

    Fuel Station of (Balad Air force Base) Project: (Sallyport) – 2021 Our Scope contains the following activities: – Modifications on existing PLC System and Construct and develop a Monitoring system as per the standards and client specification. – Rehabilitation for Control and power circuit which controlling on Offloading and fueling pumps. – Rehabilitation for earthing…

  • Sowaira Air force Base 2021

    Sowaira Air force Base 3/9/2021 Supply the site with two generators 250 KVA manufacture the main board ATS Connect the generators to the main board Design and construct a control system for the generators to work sequentially

  • IOT Project: (West Qurna-1 oil field – DS8) – 2019

    IOT Project: (West Qurna-1 oil field – DS8) – 2019 EPC for uninterruptable temporary power generation project 13MVA, the works contain the following activities: – Engineering and design the project as per the standards and client specification. – Procurement and installation for all electrical equipment (Synchronization panels, Step-up transformer, MV switchgears, cables and all accessories)….

  • MOD Project: (West Qurna-1 oil field) – 2017

    MOD Project: (West Qurna-1 oil field) – 2017 EPC for uninterruptable temporary power generation project 7MVA, the works contain the following activities: – Engineering and design the project as per the standards and client specification. – Procurement and installation for all electrical equipment (Synchronization panels, Step-up transformer, MV switchgears, cables and all accessories). – Design…

  • West Of Garna

  • Al-Taje Camp

footer-logo

  Our Projects »

  Top

Aimed company to become a leader on the level of construction sector companies in Iraq in the field of the company’s civil works and electrical and mechanical, as the company’s main objective is to keep up with the times and are encouraged to touch lightning employees to get higher positions and leadership company, depending on their qualifications and administrative policy of the company

+9647716016098

+9647903654154

management@lb.com.iq

Baghdad-Wathba Square, Opposite the Municipality of Baghdad




    ©2016 all rights reserved by Lamsa Albarq
      
    Privacy Policy