EPC for uninterruptable temporary power generation project 13MVA, the works contain
the following activities:
- Engineering and design the project as per the standards and client specification.
- Procurement and installation for all electrical equipment (Synchronization panels,
Step-up transformer, MV switchgears, cables and all accessories). - Design and construct SCADA system for project to monitoring and controlling all the
parameters of all facilities.
Our client in this project is Exxon Mobil.