• Majnoon Oil Field Project – 2022
It contains the following activities:

1- Installation of the power plant:
 Installing and connecting two electric generators, 2750 KVA -11 KV.
Connect the synchronization system to the generators
 Installing, connecting and checking MV Switchgears with all its accessories including installing Switchgears, connecting POWER CABLE and all Control works
 Connecting electrical transformers and conducting all checks.
 Connecting the SCADA system to the project to monitor and control all operations.

2- Connecting and operating the project’s water stations
3- The fire alarm system contains the following activities:
Connect the addressable type fire alarm system to all project buildings and the station consists of 383 fire sensors.
Two fire extinguishing system  (FM200 )

for Telecom building.
 Connecting all site buildings to the network network to follow up the system from any building.
Our client in this project is KBR