• Majnoon Oil Field Project – 2022
It contains the following activities:
1- Installation of the power plant:
Installing and connecting two electric generators, 2750 KVA -11 KV.
Connect the synchronization system to the generators
Installing, connecting and checking MV Switchgears with all its accessories including installing Switchgears, connecting POWER CABLE and all Control works
Connecting electrical transformers and conducting all checks.
Connecting the SCADA system to the project to monitor and control all operations.
2- Connecting and operating the project’s water stations
3- The fire alarm system contains the following activities:
Connect the addressable type fire alarm system to all project buildings and the station consists of 383 fire sensors.
Two fire extinguishing system (FM200 )
for Telecom building.
Connecting all site buildings to the network network to follow up the system from any building.
Our client in this project is KBR