- IOT Project: (West Qurna-1 oil field – DS8) – 2019
EPC for uninterruptable temporary power generation project 13MVA, the works contain the following activities:
– Engineering and design the project as per the standards and client specification.
– Procurement and installation for all electrical equipment (Synchronization panels, Step-up transformer, MV switchgears, cables and all accessories).
– Design and construct SCADA system for project to monitoring and controlling all the parameters of all facilities.
➢ Our client in this project is Exxon Mobil.