IOT Project: (West Qurna oil field – DS8) –

EPC for uninterruptable temporary power generation project 13MVA, the works contain
the following activities:

  • Engineering and design the project as per the standards and client specification.
  • Procurement and installation for all electrical equipment (Synchronization panels,
    Step-up transformer, MV switchgears, cables and all accessories).
  • Design and construct SCADA system for project to monitoring and controlling all the
    parameters of all facilities.
    Our client in this project is Exxon Mobil.